Saturday, April 2, 2011

2410 North Forest image 3


This image shows one side of the building that is open for lease. It will remain unfinished until a tenant leases the space and we can design the space for their needs. Here you can see how the raised floor is installed as a grid with square tiles being held up by metal supports. The supports are glued or adhesed to the floor which I thought wouldn't be sufficient, but apparently it is. Also you can see the raised concrete near the exterior windows which is where they have the windows for the basement on the exterior.

No comments:

Post a Comment